Saturday, October 12, 2019
Tank paintjob
This is the first check with the new pearl white painted tank. Some small parts like turn signals and the new battery added.
Thursday, June 20, 2019
Engine covers, carburettors etc.
Hey, here is the latest bits fitted on the engine including carburettors with the new o-rings and gaskets. New bits on the block also count shift shaft; switching the gears now runs smoothly. So does the clutch and throttle cable, the only enigmatic thing remains the cable of decompression cam, lifting the valves during kickstarting. The new cable and the spring are in the right place, however the lifting doesn't occur and will take some more figuring out.
Wednesday, February 20, 2019
Engine installation
Some significant milestone here! The single thumper is seated back in the right place. During the initial installation, the engine is not supposed to be attached onto the frame using the tube cradle, as I thought before. First, it needs to be hang up from above and backside to the respective brackets like with a typical backbone frame.
Lifting the engine on a jack, reminiscence of Laverda-like slope and a gearing cascade
Lower cradle tubes and generator rotor attached
Plus clutch housing
Sunday, January 13, 2019
Latest batch
A fresh update with cylinder head and valve assembly
timing chain with markings alligned (new OEM Yamaha part is surprisingly less costly then DID and other aftermarket brands)
Polished tensioner with chromed nut
and the valve cover attached
Subscribe to:
Posts (Atom)